Ross Gordon Engineering

Construction of a new workshop and 40,000 sqft of heavy duty concrete yard incorporating new drainage.

Ross Gordon Engineering operate from an existing 15,000 sqft unit located on the site and it was critical to limit disruption during the contract works for the new yard and workshop, therefore the yard was excavated, prepared, and re laid in three continuous phases to work around the clients access requirements.